M17 Project Forum

Full Version: TR-9 BOM update
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
The living document for BOM is managed on Google Drive: https://docs.google.com/spreadsheets/d/1...sp=sharing

I also put together mouser carts for all the parts with a few exceptions: The carts above are missing microphone, speaker, and standoffs.

TODO: I should feedback the mouser parts from the car into the main spreadsheet.

I should get my order today and start assembling. Always possible I missed something in consolidating to mouser.
The carts are very convenient, thanks!
I still haven't verified via populating the boards. But I did realize that I don't have any connectors that are the correct size for the headers, so I'll have to either order some or use clips to program, etc. I'll revisit and probably add some connectors for the headers. I'll also probably start a thread to track assembling the boards.
I'm mostly done with capacitor and resistors on mine.
Mouser must have messed up filling my order somehow, because I'm missing a few items but the "missing" items are in the carts linked.

Either way, your mouser carts saved me a BUNCH of time, thank you!

Actually, there is one error i think - the 0.5pF are 0201 sized instead of 0603.